Vpacket 6100 SERIES Guide d'installation Page 104

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 128
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 103
96 Acme Packet 6100 Hardware Installation and Maintenance Guide
3. Holding the extended bale clasp latch with one hand, use your other hand
to pull the optical transceiver fully out of its socket in the physical interface
card.
Figure 6 - 129. Removing the Optical Transceiver
Install an Optical
Transceiver
To install an optical transceiver:
1. Slide the replacement optical transceiver into the SFP socket on the NIU.
Figure 6 - 130. Inserting the SFP+ Optical Transceiver into the SFP+ Socket
2. Press on the face of the SFP+ optical transceiver to seat it with the socket.
Figure 6 - 131. Seating the SFP+ Optical Transceiver
Vue de la page 103
1 2 ... 99 100 101 102 103 104 105 106 107 108 109 ... 127 128

Commentaires sur ces manuels

Pas de commentaire